Jump to content

Delivery Center (Replacement for both Distribution Post and Drop-Off Point)


Recommended Posts

Delivery Centers can both send materials to and receive materials from any other Delivery Center.

To create a route, you just click the one you want to send from, then select the destination, same as the current system. Each Delivery Center displays its routes sorted into "Sending" and "Receiving".

You can assign it anywhere from 0 to 10 workers. Workers are required for sending, but not for receiving.

Assuming materials are required to build it: Every Delivery Center construction site acts as a temporary drop-off point for the supplies needed to build it. Meaning, you can place a Delivery Center to be built in a far-off district with no inhabitants, then create routes from existing Delivery Centers to deliver X logs and Y planks to the new construction site. When it has all the materials it needs, the route is automatically deleted. (These route slots can be accessed from the construction site as well, to make it clear that receiving the supplies is an option.)

I think merging these two buildings into one would simplify the district system and make it more intuitive.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...

Important Information

This website uses cookies for the purposes of: collecting information about the website use, saving settings and personalizing the User interface. You may change your cookie settings at any time. Read more in our Privacy Policy and Cookies